top of page

M923A2 900 Series 5 Ton w/ Poly Tank- Drove to Wyoming

  • Sep 1, 2016
  • 1 min read

The guys in the shop did a full service job on this truck. We went through all the fluids, the electric system, engine, etc., added fiberglass top. We got it all dialed in, added the company color paint job with logo on door. We strapped the Poly tank in the bed. Truck was ready to rock n' roll. Nice 6 hr. drive back home to Wyoming. Truck ran great, customer was very happy. Guys in the shop did an outstanding job on this build.

1 Comment


Gaylord Seavey
Gaylord Seavey
Mar 27

I see the conclusion's use of analytical neutrality. Claims remain grounded. The website offers a more thorough contextual explanation of the problem. Systemic analysis is expanded via interactive internet platforms.

Discover and get started with DragonSlots

Like
Featured Posts
Archive
Follow Us
  • Instagram
  • Facebook Basic Square
  • YouTube
  • Twitter Basic Square
bottom of page