M45A2 Bobbed 2.5 Ton 4x4- Shipped to Buckner, MO

Bobbed 2.5 Ton M45A2 Shipped. Another awesome build. Appreciate our customers patience and communication through out this build. Our customers sometimes have to wait for the build to be completed based on demand of these trucks. They can take anywhere from 4-12 months from the time we talk to finished product. Truck options:

DOT Lighting Package, Rear Sliding Window installed in Fiberglass Top, 60 Amp Reducer, Rear Trailer Hitch w/ 7 Pin Hook-up, Locking Door Handles, Trailer Brake, Interior Floor Padding, 395/85R20 Michelin XZL Tires w/ Custom Wheels, 12.00R20 Tire w/ Stock Wheel Spare, and finished it off with the CARC Green Paint scheme.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Instagram
  • Facebook Basic Square
  • Twitter Basic Square

Copyright © 2013-2020  Boyce Equipment & Parts Co., Inc.​

All Rights Reserved

Shipping - Return Policy

Web Design by Dallas Boyce